First in Russia underground traction substation
First in Russia underground lowering substation was put into operation in Moscow in January 2011. It is based on the equipment made by our company. ENERGIA designed and launched into production a series of KRU-600 small-size switchgears having front wall width 600mm specially for this project. These devices have no analogs in Russia at the moment and allow installing the compact traction substation under conditions of limited footprint.